EasyManua.ls Logo

HPE ProLiant DL325 Gen11 - Page 139

HPE ProLiant DL325 Gen11
243 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15. Power up the server.
ResultsResults
The installation is complete.
Expansion card optionsExpansion card options
The server supports the installation of full-height half-length, full-height full-length, and half-height half-length (low-profile) PCIe expansion
/ add-in (AIC) cards such as:
HPE type-p storage controller
Ethernet adapter
HDR InfiniBand adapter
Fibre channel host bus adapter (FC HBA)
Accelerator (workload, computational, or graphics accelerator)
For more information on the expansion options validated for this server, see the server QuickSpecs on the Hewlett Packard Enterprise
website:
https://buy.hpe.com/us/en/p/1014689141https://buy.hpe.com/us/en/p/1014689141
SubtopicsSubtopics
Installing the full-length expansion card retainerInstalling the full-length expansion card retainer
Installing an expansion card in the primary riser cageInstalling an expansion card in the primary riser cage
Installing an expansion card in the NS204i-u + secondary low-profile riser cageInstalling an expansion card in the NS204i-u + secondary low-profile riser cage
Installing the full-length expansion card retainerInstalling the full-length expansion card retainer
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
About this taskAbout this task
This card retainer is required when installing a full-length expansion card in the primary riser cage.
CAUTION:CAUTION: A discharge of static electricity from a finger or other conductor might damage system boards or other static-
sensitive devices. To prevent damage, observe antistatic precautions.
ProcedureProcedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Remove the server from the rack.
5. Place the server on a flat, level work surface.
HPE ProLiant DL325 Gen11 Server User Guide 139

Table of Contents

Other manuals for HPE ProLiant DL325 Gen11

Related product manuals