EasyManua.ls Logo

HPE ProLiant DL360 Gen11

HPE ProLiant DL360 Gen11
142 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
installation procedure. Improper grounding can cause electrostatic discharge.
2. Back up all server data.
3. Power down the server .
4. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5. Do one of the following:
a. Extend the server from the rack .
b. Remove the server from the rack .
6. Remove the access panel .
7. Install the secondary riser cage.
8. Install the access panel .
9. Install the server into the rack .
10. Connect each power cord to the server.
11. Connect each power cord to the power source.
12. Power up the server.
Installing a secondary full-height riser optionInstalling a secondary full-height riser option
PrerequisitesPrerequisites
This option requires a dual processor configuration.
Before installing this option, be sure you have the following:
The components included with the hardware option kit
Any expansion boards or controllers you plan to install
HPE ProLiant DL360 Gen11 Server User Guide 98

Other manuals for HPE ProLiant DL360 Gen11

Related product manuals