EasyManua.ls Logo

HPE ProLiant ML350 Gen10 - Page 76

HPE ProLiant ML350 Gen10
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6. Attach the ground (earthed) wire to the ground screw and washer and tighten to 1.47 N m (13 lb-in) of
torque. The ground wire must be connected before the -48 V wire and the return wire.
The ground wire must be connected before the -48 V wire and the return wire.
7. Insert the -48 V wire into the left side of the terminal block connector, and then tighten the screw to
1.3 N m (10 lb-in) of torque.
76 Hardware options installation

Table of Contents

Other manuals for HPE ProLiant ML350 Gen10

Related product manuals