EasyManua.ls Logo

HPE Synergy 12000 Frame

HPE Synergy 12000 Frame
121 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the DC power grounding kit (with bracket)
For clarity, the rack is not shown in the images of this procedure.
Prerequisites
The following tools are required to complete this procedure:
T-15 Torx screwdriver
8 mm socket wrench
Procedure
1.
Using the 2 hex thread-forming screws, install the bracket on the frame.
Tighten the screws to 15lb-in of torque.
2. Use two nuts to connect the cable to the bracket.
Installation 83

Table of Contents

Other manuals for HPE Synergy 12000 Frame

Related product manuals