5 Installation and commissioning
HSD S.p.A. © - h0104k02a.fm091115
31
5 Installation and commissioning
5.1 Preliminary installation checks
Before carrying out any operations, MAKE SURE:
that no parts of the product have been damaged by impact or any other cause during transport
and/or handling
that the connectors are undamaged
Do not lift the equipment up by means of the electric cables.
5.2 Preparing the factory services
It is the responsibility of the customer to ensure the availability of the factory services (e.g.
electricity supply, compressed air supply, etc.).
The electricity supply line must have a sufficient power rating. The connection to the mains
electricity supply must be carried out by a qualified electrician.
The customer is responsible for the entire power supply system to the product as far
as the connectors.
The user must use a supply connector with a connection to an efficient equipotential
protection circuit .
The earthing system must comply with current standards in the country of
installation and must be checked regularly by qualified personnel.
The product must not be installed in environments where there is an explosion risk .
Installation must be performed in a sufficiently lit area.
5.3 Work environmental requisites
Temperature: from +5 to +40°C (41÷104°F).
Maximum relative humidity (without condensation): 5÷85%.
Maximum altitude: 2000 metres a.s.l. (unless agreed otherwise with the customer).
Standard CEI EN 61800-2.