5 Installation and commissioning
HSD S.p.A. © - h0104k02a.fm091115
49
5.10 General post-installation checks
Verify the correct wiring before start-up.
Check that the unused connectors are adequately plugged.
Check that the plastic dipswitch access window is properly closed. If the window is not
present, the equipment IP degree gets compromised.
5.11 Running-in
The products, before being packaged, undergo an automatic running-in cycle to guarantee the
correct distribution of the lubricant in the races of the bearings. The running-in cycle also includes
a detailed check of all the control and signalling devices through the simulation of various
machining cycles on the test-bench. The customer must not launch any additional running-in
procedure.
5.12 Environmental conditions
The manufacturer has inspected and tested its products under standard environmental conditions
(refer to paragraph A.1 “General data” for a detailed description).
Contact HSD S.p.A. for information about the possibility of applications for special environments.