6 Commissioning
6.1 Checking Before Power-On
No. Acceptance Criteria
1 The SUN2000 is installed correctly and securely.
2 DC switches and the downstream AC switch are OFF.
3 All cables are connected correctly and securely.
4 Used cable glands are sealed and locking caps are tightened.
5 Unused terminals and ports are locked by watertight caps.
6 The installation space is proper, and the installation environment
is clean and tidy, without foreign matter.
7 The AC terminal cover is reinstalled.
8 The maintenance compartment door is closed and the door
screws are tightened.
SUN2000-(90KTL, 95KTL, 100KTL, 105KTL) Series
User Manual
6 Commissioning
Issue 11 (2020-08-30) Copyright © Huawei Technologies Co., Ltd. 66