Installation and Maintenance Manual
7
Tools Required for an Efficient Installation
1. chalkline or other
builders string
2. carpenters
pencil or crayon
3. concrete anchor
bolts - four
1
/
2
" x 4
4. allen wrench set 5. hammer
6. screwdriver sets,
Straight and Phillips
7. wrench set, open
end,
1
/
4
" through 1"
8. electric drill and
bits
1
/
8
" through
3
/
8
"
9. roto-hammer and
bits,
3
/
8
" through
1
/
2
"
10. level - it doesn't
have to look like this
one, but the installation
needs to be level!
11. Two pair wide
jaw vice grip pliers,
or two C clamps,
4" capacity