EasyManua.ls Logo

Hyd-Mech V18APC - BASE AND GUARD INSTALLATION PROCEDURES

Hyd-Mech V18APC
73 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1.4
REMOVE HEAD RESTRAINTS
Before start-up, remove the head support strut installed for shipping purposes to secure the head to the base. Replace the
two 5/16 NC countersunk screws which fasten the wear-strip down.
INSTALLATION OF THE INFEED BASE
The shipping weight of the infeed is 3000 lb. The infeed can be lifted from the datum side by forklift as shown below.

Table of Contents

Related product manuals