EasyManua.ls Logo

IBM eserver pSeries 7311 D10 - Page 149

IBM eserver pSeries 7311 D10
228 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operator Panel Replacement
To replace the operator panel, do the following:
1. Connect the power/signal cable connector to the back of the operator panel.
2. Carefully slide the operator panel back into the system bay.
3. Ensure that the two snap buttons are in the unlocked position.
Note: Snap buttons are in the unlocked position when the button component is
pulled back as far as possible.
4. Push the operator panel into the bay until it comes to rest against the subsystem
chassis.
5. Push in each snap button, locking the operator panel against the subsystem
chassis.
6. Replace the front bezel as described in “Front Bezel Replacement” on page 130.
7. If the system is in the service position, return it to the operating position as
described in “D20 Operating Position” on page 126.
8. Reconnect the power source to the system.
9. Power on the system as described in “Starting the System” on page 55.
10. Close the rack front door.
Chapter 8. Removal and Replacement Procedures 133

Table of Contents

Related product manuals