EasyManuals Logo
Home>IBM>Server>eserver pSeries 7311 D10

IBM eserver pSeries 7311 D10 User Manual

IBM eserver pSeries 7311 D10
228 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #194 background imageLoading...
Page #194 background image
14. Replace all of the previously removed PCI adapters as described in “Adding or
Replacing a Non-Hot-Pluggable PCI Adapter” on page 147.
Note: Alternately reinstall the PCI dividers, when reinstalling the PCI adapters.
15. Reconnect all PCI adapter cables to their respective adapters.
16. Reconnect the power cables to the power supplies.
17. Reconnect the power source to the system. The green LED located on the power
supply comes on solid.
18. Close then secure the service access cover with the three thumbscrews located on
its back edge.
19. Push the Model D20 subsystem back to the operating position as described in
“D20 Operating Position” on page 126.
20. After the system has successfully powered on, close the rack doors.
178 Eserver pSeries 7311 Model D10 and Model D20 Service Guide

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM eserver pSeries 7311 D10 and is the answer not in the manual?

IBM eserver pSeries 7311 D10 Specifications

General IconGeneral
BrandIBM
Modeleserver pSeries 7311 D10
CategoryServer
LanguageEnglish

Related product manuals