c.  Use  the  arrow  keys  to  increment/decrement  to  the  frame  address  of  the  processor  tower,  usually 
’02’  (0702  will  be  displayed).  Press  Enter  (0702  00  will  be  displayed). 
d.  Use  the  arrow  keys  to  increment/decrement  to  select  07Fx  where  x  is  the  AMD  to  be  powered  off 
(0=AMD  B01,  1=AMD  B02,  2=AMD  B03,  3=AMD  B04).  Press  Enter  (07Fx  00  will  be  displayed). 
The  green  LED  on  the  AMD  will  turn  off.
6.
  Remove  the  AMD  assembly. 
7.  Install  the  AMD  by  reversing  this  procedure  (some  force  is  required  to  insert  the  AMD  past  the 
spring-loaded  flap).  The  new  AMD  will  automatically  power  on  when  it  is  installed. 
8.  After  exchanging  an  item,  go  to  Verify  the  repair.
This  ends  the  procedure.
Model  840/SB3  System  unit  -  Battery  pack  (T01) 
For  use  by  authorized  service  providers. 
Use  this  procedure  to  remove  or  replace  the  battery  pack  on  a  Model  840/SB3  System  unit. 
Attention:  Removing  the  battery  power  unit  while  the  system  is  running  on  battery  power  will  cause  the 
system  to  fail  and  may  damage  the  battery  power  unit  and  the  card  enclosure. 
To  remove  or  replace  the  battery  pack  (T01): 
1.  If  the  system  is  powered  on,  you  do  not  have  to  power  off  the  system  to  perform  this  procedure. 
2.  Remove  the  rear  cover.  See  Models  840/SB3  -  Covers. 
3.  Remove  the  Battery  Backup  EMC  access  plate.  See  Final  Assembly,  Rear  -  Models  840  and  SB3 
Processor  Tower. 
4.  Remove  the  battery. 
CAUTION:
The
  weight  of  this  part  or  unit  is  between  18  and  32  kilograms  (39.7  and  70.5  pounds).  It  takes 
two  persons  to  safely  lift  this  part  or  unit.  (RSFTC204) 
CAUTION:
The
  battery  is  a  lead-acid  battery.  To  avoid  possible  explosion,  do  not  burn.  Exchange  only  with 
the  IBM-approved  part.  Recycle  or  discard  the  battery  as  instructed  by  local  regulations. 
In  the  United  States,  IBM  has  a  process  for  the  collection  of  this  battery.  For  information,  call 
1-800-426-4333.  Have  the  IBM  part  number  for  the  battery  unit  available  when  you  call. 
(RSFTC225) 
5.  Install  the  new  Battery  Backup  by  reversing  the  procedure. 
6.  After  you  install  the  new  battery,  use  HSM  to  perform  a  battery  test  to  ensure  correct  operation.
This  ends  the  procedure.
Models  840/SB3,  FC  8079-001  (lower  half),  FC  9079  cards  (concurrent) 
For  use  by  authorized  service  providers. 
Use  this  procedure  to  remove  or  replace  cards  concurrently  in  the  Models  840/SB3,  FC  8079-001  (lower 
half),  and  FC  9079. 
Concurrent/dedicated  guidelines  for  Model  840/SB3,  FC  8079-001  (lower  half),  FC  9079 
In  some  cases,  you  do  not  need  to  power  down  the  system  to  change  PCI  cards.  Use  the  following 
guidelines  to  determine  if  you  should  use  dedicated  or  concurrent  remove  and  replace  procedures.  If  you 
use  concurrent  maintenance  on  a  partitioned  system,  follow  the  procedures  from  the  partition  that  owns 
the  resource.  If  the  resource  is  not  owned,  follow  the  procedure  from  the  primary  partition. 
For  cards  in  the  Models  840/SB3  CEC: 
 
76  Hardware  (Remove  and  Replace;  Part  Locations  and  Listings)