EasyManua.ls Logo

IBM RS/6000 Enterprise Server M80 - Page 104

IBM RS/6000 Enterprise Server M80
567 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 1521-6
Are both I/O drawer power supply LEDs flashing?
NO Replace the power supply with the flashing LED.
This ends the procedure. Go to MAP 0410: Repair Checkout in the RS/6000 and Eserver
pSeries Diagnostic Information for Multiple Bus Systems.
YES Check internal drawer cabling from power distribution card to primary I/O backplane. See “Primary
I/O Drawer Cables” on page 481.
Replace the following, one at a time:
v Primary I/O drawer BACKPLANE
v Power distribution board
This ends the procedure. Go to MAP 0410: Repair Checkout in the RS/6000 and Eserver
pSeries Diagnostic Information for Multiple Bus Systems.
Step 1521-7
Are all SPCN cables seated firmly and connected correctly between the primary I/O drawer,
secondary I/O drawers, and CEC drawer?
NO Fix the cable connections.
This ends the procedure. Go to MAP 0410: Repair Checkout in the RS/6000 and Eserver
pSeries Diagnostic Information for Multiple Bus Systems.
YES Go to “Step 1521-8” on page 87.
86 Service Guide

Table of Contents

Other manuals for IBM RS/6000 Enterprise Server M80

Related product manuals