EasyManuals Logo

IBM RS/6000 Enterprise Server M80 User Manual

IBM RS/6000 Enterprise Server M80
567 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #110 background imageLoading...
Page #110 background image
Map 1522: Cannot Power On the CEC Drawer
Step 1522-1
Attempt to power on the CEC drawer (see “Powering Off and Powering On the System” on page 415).
Does the CEC drawer power on?
NO Go to “Step 1522-2.”
YES This ends the procedure. Go to MAP 0410: Repair Checkout in the RS/6000 and Eserver
pSeries Diagnostic Information for Multiple Bus Systems.
Step 1522-2
Look at the power supply LEDs at the back of the CEC drawer.
Is there a power supply with a flashing LED?
NO Go to “Step 1522-3.”
YES Replace the power supply with the flashing LED.
This ends the procedure. Go to MAP 0410: Repair Checkout in the RS/6000 and Eserver
pSeries Diagnostic Information for Multiple Bus Systems.
Step 1522-3
Are all SPCN cables seated firmly and connected correctly between the primary I/O drawer,
secondary I/O drawers and CEC drawer?
NO Fix the SPCN cable connections
This ends the procedure. Go to MAP 0410: Repair Checkout in the RS/6000 and Eserver
pSeries Diagnostic Information for Multiple Bus Systems.
YES Go to “Step 1522-4.”
Step 1522-4
Is this machine connected to dc power?
NO Go to “Step 1522-8” on page 93.
YES Go to “Step 1522-5” on page 93.
92 Service Guide

Table of Contents

Other manuals for IBM RS/6000 Enterprise Server M80

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM RS/6000 Enterprise Server M80 and is the answer not in the manual?

IBM RS/6000 Enterprise Server M80 Specifications

General IconGeneral
BrandIBM
ModelRS/6000 Enterprise Server M80
CategoryServer
LanguageEnglish

Related product manuals