21
Installation and Servicing
SECTION 2 - INSTALLATION
INSTALLATION
2.11 MOUNTING THE BOILER - EXTERNAL
1. Fit the ue turret. Refer to section 2.14.
2. Ensure the plastic plugs are rmoved from both the CH and DHW connections before mounting the boiler.
Note: Boiler may contain residual water.
3. Lift the boiler onto the wall mounting plate (refer to the Introduction section for safe handling advice), locating it over the two
tabs.
Note: Install service connections at this point.
1 3
Ensure the
ue turret is
perpendicular to the
front of the boiler.