23
Install regional air valves and PVC pipes
Dot matrix or matrix is chosen according to the application industry.
Bracket for holding the tubes
On the other side of the zero point, assemble the regional valves firstly, and then PVC pipes.
A
The PVC pipes are labeled ,the order must be followed!
B
1A --- 1H 2A --- 2H 3A --- 3H 4A --- 4H
C
Do up the straps.
D
Fasten the piping system to the cutter by using glue, hoops and cable ties.