EasyManua.ls Logo

Indu-Sol PROFview XL - Setting and Measuring

Default Icon
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Manual PROFview XL 4 The PROFview XL Application Software
This measurement simplifies the station-related displaying and evaluation of the data sent along the
PROFIBUS through the use of an oscilloscope, since triggering is only performed exactly to one station ad-
dress. The Sections 2.3.4 "Connecting the PROFIBUS Tester to a storage oscilloscope" and 3.2.6 "Trigger-
ing to a station address" describe in detail how the PBT can be used in conjunction with an oscilloscope.
4.7.2 Setting and measuring
The requirements for this measurement are:
The PBT must be connected both to a PC and to the PROFIBUS plant (bus status LED = green/yellow)
The correct baud rate must be selected.
The master simulator must be activated if necessary (only required when performing a measurement on
an idle plant - bus status LED = yellow/red, differential voltage > 0.1 V)
The correct measuring point must be selected.
At least one station must exist in the station list and must be marked as "to be measured".
PROFview XL 23

Table of Contents