BPD series PV pumping inverter    Installation guide 
61 
(2) If applying mains supply, detect the voltage of AC wiring port at AC input side is in 
the allowable voltage range of the grid; 
(3) Check the inverter is properly grounded; 
(4) Ensure that all DC inputs or AC inputs are in power-off state before connecting the 
cables to the inverter; 
(5) Ensure that all electrical safety precaution signs are clear on the installation site; 
(6) Ensure that the external keypad is correctly connected. 
5.6 Description of LED indicators 
The  inverter  has  been  power-on  and  the  control  circuit  is 
working. 
The  inverter  reports  an  alarm,  and it  will  automatically  restart 
after the alarm is removed.