nano3G AP Installation Manual nano3G AP Hardware Installation
N3G_INST_300 v8.1 for N3G_2.0.5 © ip.access Limited 2011 Page 54
6.4 nano3G E8 AP Hardware Installation
6.4.1 Unpack the nano3G E8 AP
1) Unpack the nano3G E8 AP and its accessories.
Box contents may vary, but typically the box should contain the following:
nano3G E8 AP unit with wall bracket attached
Extraction tool for removing the AP from its wall bracket
Injector unit for POE+
Mains cable for the POE+ injector
2) Check that the serial number on the nano3G E8 AP unit matches the label on the
box.
3) Check that the items have not been damaged in transit.
For any damaged units, contact the supplier immediately for returns advice.
6.4.2 Removable Cable and Antenna Covers
The nano3G E8 AP has two removable covers. The top cover goes over the antennae, and
the bottom cover goes over the cable sockets.
1) Place the unit on a flat surface.