EasyManua.ls Logo

Ivoclar digital PrograMill One - Page 42

Ivoclar digital PrograMill One
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Initial Operation
42
5. Shift the transport lock over the
spindle (1).
6. Remove transport lock from the milling
chamber (2).
7. Hold the cover and collection container
in a slightly tilted position and insert it
into the milling chamber (1).
8. Shift the tilted collection container with
the cover over the spindle (1).
9. Insert the loading aid (1) in the direction
of the arrow.
10. Follow the instructions in the app.
We recommend that you keep the transport protection components for correct
transportation in the event of service work.
1.
1.
1.
1.
1

Table of Contents