Table 17: Site Preparation Checklist for Services Gateway
Installation (continued)
NotesDatePerformed By
Additional
InformationItem or Task
“Preparing the
SRX110 Services
Gateway for
Wall-Mount
Installation” on
page 87
Verify that the area
selected meets the
minimum
requirements.
Verify that you have
the required hardware
for proceeding with
the installation.
Desktop Installation
“Preparing the
SRX110 Services
Gateway for
Desk-Mount
Installation” on
page 86
Verify that the area
selected meets the
minimum
requirements.
Plan the installation
location, including
required space
clearances and
airflow requirements.
Cables
“Interface Cable
and Wire
Specifications
for the SRX110
Services
Gateway” on
page 71
Acquire cables and
connectors.
Review themaximum
distance allowed for
each cable. Choose
the length of cable
based on the distance
between the
hardware
components being
connected.
Plan the cable routing
and management.
Related
Documentation
SRX110 Services Gateway Specifications on page 7
Installation Overview for the SRX110 Services Gateway on page 77
General Site Guidelines for Installing the SRX110 Services Gateway on page 38
SRX110 Services Gateway Cabinet Requirements on page 38
SRX110 Services Gateway Rack Requirements on page 39
Clearance Requirements for Airflow and Hardware Maintenance of the SRX110 Services
Gateway on page 40
37Copyright © 2012, Juniper Networks, Inc.
Chapter 6: Preparing the Site for Installation