EasyManuals Logo

KBR multicomp F144-NC-1V1C6DO6RO-2 User Manual

KBR multicomp F144-NC-1V1C6DO6RO-2
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #22 background imageLoading...
Page #22 background image
Rev. 1.00
20801-EDEBDA0232-4716-1_EN
22
KBR multicomp F144-NC-1V1C6DO6RO-2 Description of the display window




7 Description of the individual display win-
dows
7.1 Initialization window:
This is displayed after attaching the supply voltage to the controller.
Note
During the initialization period, please do not press any sensor buttons;
they are adjusted automatically to ensure correct operation.
7.2 Commissioning window if no stage power is programmed:
At the initial startup of the multicomp F144-1V1C6DO6RO-2, the Commis-
sioning menu is displayed as the start screen (after the initialization phase)
once you have set up the supply voltage.
This menu is used for the initial startup of the controller, where all necessary
settings can be made.
If a controller that is already integrated into a KBR compensation system by
default should be used, only the parameters of the current transformer
have to be con gured.
Select submenus by pressing
.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the KBR multicomp F144-NC-1V1C6DO6RO-2 and is the answer not in the manual?

KBR multicomp F144-NC-1V1C6DO6RO-2 Specifications

General IconGeneral
BrandKBR
Modelmulticomp F144-NC-1V1C6DO6RO-2
CategoryController
LanguageEnglish

Related product manuals