Generating an SRQ on calibration complete
An SRQ (service request) can be used to detect operation complete instead of repeatedly poll-
ing the Model 2000. To use this method, send both *ESE 1 and *SRE 32 to the instrument, then
include the *OPC command at the end of each calibration command line, as covered above. Re-
fer to your controller's documentation for information on detecting and servicing SRQs.
3-20 Calibration Command Reference