BA 35203_04 * 3.0 * 35203_04_04_Inbetriebnahme_04.fm 4-55
Putting into operation 4
Functional check of all control elements
• – see chapter 5 “Checking the steering system” on page 5-2
• – see chapter 5 “Brake/inching pedal” on page 5-14
• – see chapter 5 “Lights/signalling system” on page 5-25
• – see chapter 5 “Operating hydraulics” on page 5-35
Transport position of bucket
Remove buckets/attachments that are not certified for transportation on
public roads, and move or transport them with a suitable means of
transportation – see chapter 3 “Use of attachments on the machine” on
page 3-11.
Loader unit operation – see chapter 5 “Operating hydraulics” on
page 5-35:
1. Empty and tilt back the bucket B.
2. Raise the loader unit until both red marks D on the lift frame and the
bulkhead are aligned.
➥ Ground clearance C about 250 mm (9.84 in).
3. Cover the blade or teeth of the bucket across their entire width with the
tooth guard A provided.
4. Secure the joystick – see “Securing the control lever (joystick)/
switching off the operating hydraulics” on page 4-54.