EasyManua.ls Logo

Kramer 8115

Kramer 8115
422 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BA 35203_04 * 3.0 * 35203_04_05_Bedienung.fm 5-33
Operation 5
Air conditioning (option)
Information on putting the air conditioning into operation
For cooling and heating, the air conditioning system supplies dehumidified
and purified air to the cabin.
In order to achieve best air conditioning results:
Before putting into operation, ventilate the cabin thoroughly.
Close the windows and doors.
Set the fan to maximum output first, and then adjust it to your needs.
In order to prevent condensation water from forming on the condensor,
switch off the air conditioning system in due time before the end of
work.
NOTICE
Observe the following points in order to avoid malfunctions, loss of
refrigerant and drying-out of the seals:
Run the air conditioning system at least once a month
(always leave it switched on it if possible).
Clean the heat exchanger (condenser) regularly.
Daily in dusty or dirty work conditions
see chapter 7 “Air conditioning (option)” on page 7-56.
Check the V-belt for cracks and correct tension
see chapter 7 “Checking the V-belt (compressed-air brake option)”
on page 7-42.
Have the air conditioning checked at least once a year by an
authorized service centre.
The air conditioning system must only be repaired, serviced and filled
with a refrigerant by trained personnel and an authorized service
centre.

Table of Contents

Related product manuals