EasyManua.ls Logo

Kubota KX080-3 - Operation of the Bucket; Unit Swing and Boom Swing Operation; Unit Swing Operation

Kubota KX080-3
115 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EXCAVATOR OPERATION32
OPERATION OF THE BUCKET
To dig using the bucket, move the right attachment control
lever from the neutral position, left. Moving the control
lever right, moves the bucket outwards and empties its
contents.
UNIT SWING AND BOOM SWING
OPERATION
To avoid personal injury:
A When working in groups, always let the others
know what you are going to do before you do it.
A Keep others away from the machine working
area.
A Be sure to lock the boom swing pedal when the
boom swing function is not used.
BUnit Swing Operation
1. Move the control lever to the left and the upper
structure will turn to the left.
2. Move the control lever to the right and the upper
structure will turn to the right.

Table of Contents

Other manuals for Kubota KX080-3

Related product manuals