EasyManua.ls Logo

Lauda ECO GOLD - Operational Preparation; Assembly, Siting, and First Switch-On

Default Icon
132 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24 / 134 ECO Gold 09/2021
6 Before putting the device into operation
Please note:
- The device can be operated up to an ambient temperature of 40 °C.
- A higher ambient temperature can have a negative effect on the cooling output of the thermostats used.
- When putting the chiller into operation after a lengthy shut-down, up to 30 minutes may pass until the rated refriger-
ating power is available depending on room temperature and device type.
6.1 Assembly and siting
Always comply with the following safety information:
Warning!
Falling / toppling equipment on sloping surfaces / table edge
Crushing of hands and feet
Only site the device on flat surfaces, not near the edge of
the bench or table.
Affix the symbol "Hot surface".
The ECO thermostat is used as:
- Immersion thermostat (optionally with cooling coil and/or pump connection set),
- Heating thermostat (heating bath and circulation thermostat),
- Cooling thermostat (cooling/heating bath and circulation thermostat).
Assembly as immersion thermostat
- Push the screw clamp on the underside of the control head
into the guide rails.
- Insert the thermostat with the screw clamp into the tem-
perature control vessel ( 9) and screw the clamp tightly to
the bath edge with the knurled screw.
- With plastic baths the tubular heating element must not
contact the bath wall.
- Ensure that the ventilation opening at the back of the device
is free.
- Keep a distance of at least 20 cm free on all sides of the de-
vice.

Table of Contents

Other manuals for Lauda ECO GOLD

Related product manuals