EasyManua.ls Logo

Lauda Ecoline RE 204 - 5 Preparations; Assembly and Setting up

Lauda Ecoline RE 204
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparations
14
5 Preparations
5.1 Assembly and setting up
Place the unit on a flat surface
After transport and before starting up, store it
standing in upright position for two hours if
possible.
Do not cover the ventilation openings at the
back of the unit and ist lower part.
Keep clear distance of at least 40 cm.
Adjust the pump setting knob so that when
using the unit as bath thermostat (no external
circulation) the flow emerges at the opening for
the bath circulation, or link together the pump
connections.
(See ill. 3).
Operation with external consumer (circulation
thermostat) (Section 5.4.)
Adjustments of the pump outflows (Section 5.4.)
Ill 1
Pump setting knob turned
anticlockwise
Ill 1
Pump setting knob medium
position
Ill 3.
Pump setting knob turned
clockwise

Related product manuals