Contents
Contents .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  i
Safety .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . iii
Safety inspection checklist .  .  .  .  .  .  .  .  .  .  . iv
Chapter 1.  Introduction .  .  .  .  .  .  .  .  . 1
Server package contents .  .  .  .  .  .  .  .  .  .  .  .  1
Features.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  2
Specifications .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  3
Particulate contamination .  .  .  .  .  .  .  .  .  .  8
Management options.  .  .  .  .  .  .  .  .  .  .  .  .  .  9
Chapter 2.  Server components .  .  .  .  13
Front view .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  14
Front operator panel .  .  .  .  .  .  .  .  .  .  .  16
Front operator panel with LCD display .  .  .  .  17
Rear view .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  21
Optional processor and memory expansion tray .  .  25
PCIe riser cards.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  27
2.5-inch drive backplanes .  .  .  .  .  .  .  .  .  .  .  28
RAID adapters .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  29
Internal cable routing.  .  .  .  .  .  .  .  .  .  .  .  .  30
Guideline for cable routing for 2.5-inch  
drives .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  30
Cable routing for 2.5-inch drives to one  
backplane .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  33
Cable routing for 2.5-inch drives to two  
backplanes.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  36
Parts list.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  49
Power cords .  .  .  .  .  .  .  .  .  .  .  .  .  .  53
Chapter 3.  Server hardware setup .  .  55
Server setup checklist .  .  .  .  .  .  .  .  .  .  .  .  55
Installation Guidelines .  .  .  .  .  .  .  .  .  .  .  .  56
System reliability guidelines .  .  .  .  .  .  .  .  57
Working inside the server with the power on .  .  57
Handling static-sensitive devices .  .  .  .  .  .  58
Memory module installation rules and order .  .  .  .  58
DRAM DIMM installation order .  .  .  .  .  .  .  58
DCPMM and DRAM DIMM installation order .  .  77
Install server hardware options .  .  .  .  .  .  .  .  .  87
Remove the security bezel .  .  .  .  .  .  .  .  .  88
Remove the top cover .  .  .  .  .  .  .  .  .  .  89
Remove a 4U PCIe riser assembly .  .  .  .  .  .  90
Remove the PCIe expansion tray .  .  .  .  .  .  92
Remove the chassis air baffle .  .  .  .  .  .  .  93
Remove the system board air baffle and the 
power interposer .  .  .  .  .  .  .  .  .  .  .  .  94
Remove the processor and memory expansion  
tray .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  96
Remove the fan cage assembly .  .  .  .  .  .  .  98
Install a processor-heat-sink module.  .  .  .  .  101
Install a memory module .  .  .  .  .  .  .  .  .  104
Install a drive backplane.  .  .  .  .  .  .  .  .  .  105
Install a 2.5-inch hot-swap drive .  .  .  .  .  .  107
Install the fan cage assembly .  .  .  .  .  .  .  .  109
Install the system board air baffle and the 
power interposer .  .  .  .  .  .  .  .  .  .  .  .  110
Install the processor and memory expansion  
tray  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  112
Install the PCIe riser card assembly .  .  .  .  .  114
Install the LOM adapter .  .  .  .  .  .  .  .  .  .  118
How to adjust the position of the retainer on 
the M.2 backplane .  .  .  .  .  .  .  .  .  .  .  .  119
Install an M.2 drive in the M.2 backplane .  .  .  120
Install the M.2 backplane .  .  .  .  .  .  .  .  .  121
Install the chassis air baffle .  .  .  .  .  .  .  .  123
Install the PCIe expansion tray .  .  .  .  .  .  .  124
Install a 4U PCIe riser assembly.  .  .  .  .  .  .  126
Install the top cover .  .  .  .  .  .  .  .  .  .  .  128
Install the security bezel.  .  .  .  .  .  .  .  .  .  130
Install the server in a rack .  .  .  .  .  .  .  .  .  .  .  131
Cable the server .  .  .  .  .  .  .  .  .  .  .  .  .  .  131
Power on the server .  .  .  .  .  .  .  .  .  .  .  .  .  131
Validate server setup.  .  .  .  .  .  .  .  .  .  .  .  .  132
Power off the server .  .  .  .  .  .  .  .  .  .  .  .  .  132
Chapter 4.  System configuration .  .  . 133
Set the network connection for the Lenovo XClarity 
Controller .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  133
Update the firmware .  .  .  .  .  .  .  .  .  .  .  .  .  134
Configure the firmware .  .  .  .  .  .  .  .  .  .  .  .  137
Memory configuration .  .  .  .  .  .  .  .  .  .  .  .  138
Configure Persistent Memory Module  
(PMem) .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  139
RAID configuration .  .  .  .  .  .  .  .  .  .  .  .  .  144
Deploy the operating system.  .  .  .  .  .  .  .  .  .  144
Back up the server configuration .  .  .  .  .  .  .  .  145
Update the Vital Product Data (VPD).  .  .  .  .  .  .  145
Update the Universal Unique Identifier  
(UUID).  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  145
Update the asset tag .  .  .  .  .  .  .  .  .  .  .  147
Chapter 5.  Resolving installation  
issues .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 149
© Copyright Lenovo 2017, 2022 i