Do you have a question about the Lenze 8230 Series and is the answer not in the manual?
Protection Class | IP20 |
---|---|
Enclosure Rating | IP20 |
Output Voltage Range | 0 to Mains Voltage |
Communication | CANopen, PROFIBUS |
Control Modes | V/f control |
Protection Features | Overcurrent, Overvoltage, Undervoltage, Overtemperature, Short circuit |
Ambient Temperature Range | -10°C |
Presents detailed electrical data for the inverter at its rated current with 1.2x overload capacity.
Provides detailed electrical data for the inverter at 1.5x rated current with 60s overload.
Details the operator control unit for operation, control, and monitoring of the inverter.
Provides instructions for making electrical connections and wiring the unit.
Details the terminal connections for the power stage of the inverter.
Describes the A10 control board and its various plug and terminal connections.
Explains the function of each terminal on the :X15 control board terminal strip.
Critical safety precautions to be followed during transport, installation, and connection.
Guidance on proper mounting and environmental conditions for inverter installation.
Detailed instructions for making all electrical connections and wiring the unit.
Guidelines for installation and wiring to ensure proper electromagnetic compatibility.
Additional measures for achieving high EMC performance in industrial environments.
Describes how to operate the inverter using the BDE control unit.
Step-by-step guide on how to navigate menus and adjust inverter parameters.
Detailed explanation of all parameters and the information displayed on the unit.
Parameters used for setting speed limits, overspeed references, and current limits.
Settings for configuring analog inputs and outputs for demand and monitoring.
Settings for configuring digital inputs and outputs for control signals and status.
Parameters for adjusting control loop gains and times, like speed and flux controllers.
Information on accessing and interpreting error and event logs for troubleshooting.
Essential safety precautions to ensure safe commissioning procedures.
A visual flowchart detailing the step-by-step process for commissioning the inverter.
Instructions for correctly connecting the inverter to the mains supply and the motor.
Initial setup steps performed using the BDE control unit.
Inputting essential rating data for the inverter, motor, and load.
Detailed diagram and instructions for wiring the control board terminal strip.
Detailed listing of potential errors, their causes, and recommended remedies.