26 Chapter 3 Electrical Installation
Liebert NXC 30kVA And 40kVA UPS User Manual
Figure 3-11 Signal cables wiring route (bottom cable access)
Step 3: Remove this
Step 1, 2 (A)
A amplified view
through cable trough
Step 6 (B)
B amplified view
Step 5: Route cables
Step 4: Remove this
cover board of the
transfer terminal block
power distribution board
Step 1: Remove this cover board,
and lead cables into cabinet
Step 2: Use cable ties to fasten
cables onto the cabling mount
Step 6: Use cable tie to fasten cable onto
the cabling mount next to each port, and
connect cables to corresponding terminals