D9U001MC0-0101_1626
8 Putting into Service
WARNING!
Risk of injury when working on the bed!
► Ensure that the bed is disconnected from the mains connection prior to putting into service, putting out of service
and maintenance.
► Ensure that the castors are locked prior to putting into service, putting out of service and maintenance.
CAUTION!
Material damage due to incorrect putting into service!
► Ensure that putting into service is performed exclusively by manufacturer´s customer service or trained hospital
personnel.
Set up the bed as follows:
► Unpack the bed.
► Check the delivery (see Scope of Delivery and Bed Variants).
► Remove isolating foil from mains control box (see Accumulator Activation).
► Install equipment and accessories.
► In case of delivery with dismounted head board and foot board, mount the head board and foot board (see Head Board
and Foot Board).
► Set-up the bed only on a suitable oor surface (see Transport).
► Ensure the mains cable does not collide or get stretched when adjusting the bed. Check the plug is inserted
correctly.
► Do not leave any extension cords or power strips loose on the oor.
► Ensure all the required mechanical and electrical prevention mechanisms are available on site.
► There is no mains switch on the bed, i.e. the mains cable is the only means to isolate the bed from the mains.
► Ensure the mains cable is always accessible.
► The plug on the mains cable should only be changed and maintained by qualied and trained service technicians
authorised by the manufacturer.