EasyManua.ls Logo

Lucent Technologies PARTNER MAIL - Page 29

Lucent Technologies PARTNER MAIL
179 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
PARTNER II Release 3 Hardware Requirements
The following PARTNER II Release 3 equipment is required to install the PARTNER
MAIL system:
PARTNER II Release 3 Control Unit equipped with Processor Module
Release 2 206 Module
Preparing the Site
The PARTNER MAIL unit should be wall-mounted adjacent to the PARTNER II
System’s Control Unit, on the same mounting surface if possible.
WARNING:
If there is not sufficient room on the existing mounting surface, either secure a
new surface (a piece of plywood) or attach the PARTNER MAIL unit directly to
wall studs. This will best ensure permanent mounting and will prevent wall
damage.
To help ensure trouble-free operation, maintain the following environmental
conditions:
Dust-free area (preferably in an office environment)
Vibration free area
Relative humidity 8% to 85%
No exposure to liquids (avoid areas near drinking fountains, coffee makers,
and so on)
Recommended Temperature range: 60°F (15°C) to 80°F (26°C)
Maximum Temperature range: 40°F (4°C) to 104°F (40°C)
Adequte clearance around PARTNER MAIL unit
Do not place objects on top of the PARTNER MAIL unit
Do not block the PARTNER MAIL unit’s vents or openings
Preparing for Installation
2-3

Table of Contents