EasyManuals Logo

Mahindra ML170 series User Manual

Mahindra ML170 series
79 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #47 background imageLoading...
Page #47 background image
46
8.1.7. Align bearing box top pin with
tower top receiver guide post, both
sides. Make sure loader is centered
right to left on both towers.
Bearing Box Top Pin
Tower Top Receiver Guide Post
Tower Top Receiver
Tower Bottom Receiver
Tower
Bearing Box
Bearing Box Bottom
Pin
Bearing Box
Centered
Right to Left
on Tower
8.1.8. Extend lift cylinders (A) slowly making sure
loader seats completely in tower top receivers (B) and
tower bottom receivers (C).
8.1.9. Extend tilt cylinders (D) until bucket is rolled
over 90
o
. Adjust lift cylinder so bucket is approximately
1/2" off ground.
8.1.10. Secure loader to mounting brackets as follows.
Bucket positioned 1/2" off ground.
8.1.11. Reinstall handle pins to bearing boxes and
secure using snap pins.
Bearing Box
Handle Pin
and Snap Pin
8.1.12. Remove parking stands from parked position.
Return clevis pins and hairpin cotters to attaching
brackets for storage.
Clevis Pin and Hairpin Cotter
in Park Position.
Attaching Bracket.
Parking Stand
in Park Position.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mahindra ML170 series and is the answer not in the manual?

Mahindra ML170 series Specifications

General IconGeneral
BrandMahindra
ModelML170 series
CategoryTractor
LanguageEnglish

Related product manuals