EasyManua.ls Logo

Manitowoc GROVE GMK 4100 - Page 174

Manitowoc GROVE GMK 4100
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Boom extension
4.1 Rigging work checklists
4 - 6 3 112 441 en Lattice extension operating instructions
GMK 4100/4100-L/5095
11.01.2008
5. Unreeve the hoist rope from the hook block and remove it from the lat-
tice extension;
à Applying / removing the hoist rope, p. 4 - 19.
6. Remove the hoist rope and fold in the deflection sheaves on all sections
of the boom extension;
à Applying / removing the hoist rope, p. 4 - 19,
à Folding in deflection sheaves, p. 3 - 65,
à Folding in the deflection sheave, p. 4 - 18.
7. Only applies to the inclinable swing-away lattice.
At angles of 20° or 40°, set the angle to 0°;
à Setting the angle – with an auxiliary crane, p. 3 - 79,
à Setting the angle – without auxiliary crane, p. 3 - 80.
8. Remove the anemometer;
à Installing / removing the anemometer,
p. 3 - 71.
9. Only applies to the inclinable swing-away lattice.
Disconnect the hydraulic connection;
à Main boom connection – section 3, p. 4 - 13,
à Connection to the swing-away lattice, p. 4 - 14.
10. Disconnect the electrical connections;
à Main boom connection – section 3, p. 4 - 16,
à Connection to the swing-away lattice, p. 4 - 17.

Table of Contents

Related product manuals