EasyManua.ls Logo

Manitowoc GROVE GMK 4100 - Page 88

Manitowoc GROVE GMK 4100
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Swing-away lattice
3.3 Rigging work checklists
3 - 18 3 112 441 en Lattice extension operating instructions
GMK 4100/4100-L/5095
11.01.2008
17. If section 2 is transported on a separate vehicle, install section 2 before
section 1:
Sling section 2;
Slinging points, S. 2 - 5.
Lift section 2 in front of section 1 and pin it there;
à p. 3 - 59.
After installing section 2, continue with point 23.
18. If section 2 is folded onto section 1, fasten the guide rope to the head of
section 2.
19. Move the connection in the
Middle area into the On section 1 position;
à p. 3 - 43.
20. Swing section 2 in front of section 1;
à When rigging – section 2,
p. 3 - 57.
21. Establish the connection on the left between section 2 and section 1;
à Establishing / undoing connections at the swing-away lattice, p. 3 - 59.
22. Establish the electrical connection;
à p. 3 - 63.

Table of Contents

Related product manuals