EasyManua.ls Logo

Manitowoc MLC100-1 - CONNECT JIB EXTENSION CABLE; INSTALL JIB BLOCK-UP LIMIT COMPONENTS

Manitowoc MLC100-1
188 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manitowoc Published 10-09-2020, Control # 259-06 7-13
MLC80A-1/MLC90A-1/MLC100A-1/MLC100-1 SERVICE/MAINTENANCE MANUAL POWER TRAIN
7
Item Description
1 Foot Pedal Housing
2 Foot Pedal
3 Foot Pedal Shaft (right)
4 Foot Pedal Shaft (left)
5 Torsion Spring
6 Potentiometer
7 Zener Diode
8 Roller Bearing (qty 2)
9 Conduit Nut
10 Roll Pin (qty 2)
11 Receptacle/Control Wires
12 Black Wire (ground)
13 Green Wire (signal)
14 White Wire (supply)
15 Resistor
16 Flat Head Brass Screw (qty 2)
17 Setscrew, 3/4 in
18 Setscrew, 3/16 in
Potentiometer (Elect. Schematic)
Supply (white)
Signal (green)
Ground (black)
:Low Idle
High Idle
Surface X
These two holes should be
aligned when initially inserting the
shaft and spring into the housing.
Pedal Position A
:
Low Idle
High Idle
Pedal Position B
83 mm (3-1/4 in)
89 mm (3-1/2 in)
Flat on the Head
of the Shaft
FIGURE 7-10
FOR REFERENCE
ONLY

Table of Contents

Other manuals for Manitowoc MLC100-1

Related product manuals