Installation
0000000141 - 002 - EN 26
5.4 Commissioning
5.4.1 Prerequisites for commissioning
WARNING
Risk of injury posed by improper installation of the gas booster!
Improper installation of the gas booster can lead to accidents resulting in severe
injuries or death.
Permissible pressures at the inlet and outlet of the gas booster must not ex-
ceed the maximum permitted operating pressure of the gas booster.
In case of two-stage gas boosters, the maximum permitted operating pres-
sure of the first and second stage may be different.
WARNING
Risk of injury posed by improper installation of the connecting lines!
Improper installation of the gas booster can lead to accidents resulting in severe
injuries or death.
Connecting lines must be hermetically sealed long-term.
Check connecting lines for leaks.
Replace any faulty components immediately.
WARNING
Risk of injury posed by improper installation of the gas booster!
Improper installation of the gas booster can lead to accidents resulting in severe
injuries or death.
The system-specific stall pressure of the gas booster must not exceed the
maximum permitted operating pressure.
The system-specific stall pressure must be calculated before commissioning
If necessary, secure the system accordingly.
Prior to commissioning the gas booster, the system-specific stall pressure must
be calculated. The stall pressure of the gas booster is calculated for the respec-
tive gas booster type using the following formulas: