EasyManua.ls Logo

MELAG MELAtherm 10 Evolution - Page 20

MELAG MELAtherm 10 Evolution
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Commissioning
20
Ascertaining the metering quantities of the process agents
After ascertaining the density, ascertain the metering quantity in gramme [g]. During a program run, pro-
ceed as follows to calculate the quantities of cleaning agent, neutralizer and rinse aid consumed:
1. Either place the cleaning agent container on the scales and read off the total weight or reset the
scales to zero by pressing the tare key if possible.
2. Start the device with basis basket in the program preferred by the practice (PLEASE NOTE: In the
ophthalmology the Ophthalmo-Program).
3. Check all connections, chamber conduits for leaks during a program run.
Ê As soon as the display shows “Cleaning” and the metering temperature is reached, the cleaning
agent metering pump will start metering the cleaning agent audibly. The metering has stopped
once the pump sound has stopped.
4. Note the weight change in grammes after metering the cleaning agent.
5. Take the cleaning agent container from the scales.
6. Either place the container with neutralizer on the scales and ascertain the total weight or reset the
scales to zero by pressing the tare key if possible.
Ê As soon as the displays shows "Neutralization", the neutralizer metering pump will start metering
the neutralizer audibly. The metering has stopped once the pump sound has stopped.
7. Note the weight change in grammes after metering the neutralizer.
8. Take the neutralizer container from the scales.
PLEASE NOTE
The Ophthalmo-Program does not require the rinse aid.
9. Either place the container with rinse aid on the scales and ascertain the total weight or reset the
scales to zero by pressing the tare key if possible.
Ê As soon as the display shows “Disinfection” and the metering temperature is reached, the rinse aid
metering pump will start metering the rinse aid audibly. The metering has stopped once the pump
sound has stopped.
10. Note the weight change in grammes after metering the rinse aid.
PLEASE NOTE
The hose must be re-mounted before the end of disinfection (5min holding time) and
before the start of drying in order to avoid steam and hot air emission.
11. Ten minutes before program end, the program can be stopped in the “Drying” partial cycle.

Related product manuals