4 Commissioning
22
When having an altitude above 800m, perform the following settings in order to reduce the disinfection
temperature:
ü
The Service > VRP Process-relevant parameters menu is displayed.
1. Select the partial cycle "Disinfection" in the respective program.
2. In the partial cycle "Disinfection", set the parameter Time in s to 600s and the parameter
Temperature in °C to 88°C.
3. Perform these settings for all available programs.
4. Note these settings in the Process-relevant parameters (VRP) [}page23] chapter.
Resetting the maintenance counter
The maintenance counter must be checked upon first commissioning.
In a device which has not yet been used, the maintenance counter is already running as it saved the
manufacture date after completion.
Reset the maintenance counter after the set-up in the Diagnosis and service menu, see separate
instructions "Resetting the maintenance counter" (doc.:AS_005-18).
Checklist
▪ The water treatment unit is connected.
▪ The salt container contains sufficient salt.
▪ The cold water tap is open.
▪ The device power switch is on.
▪ The "Regeneration" program has been started first.
▪ The process agents have been filled.
▪ The metering system has been bled.
▪ The metering process has been checked in terms of the metering quantity.
▪ The basis basket is in place.
Validation
Detailed information regarding the validation of the device can be found in the separate document
"Recommodations for the validation of MELAtherm 10 Evolution" (doc.:AS_007-19).