4 Commissioning
18
4 Commissioning
After installing the device, the following works have to be performed in accordance with the "Record of
installation and setting up". Tools required:
▪ High-precision scales (accuracy d=0.1g or better)
▪ Measuring cylinder with a scale of up to 250ml (+/- 2ml)
▪ Container tap for 5litre and 10litre container (art. no. 70100)
Date and time
} Set date and time in the Settings menu.
Logging
} In the Settings > Log settings menu, perform the required settings in order to record and save
the logs.
Filling the regeneration salt
1. Before first commissioning, fill the salt container with water until it flows over so salt can dissolve in it.
2. Fill the salt container with 1kg of regenerating salt. If there is not enough salt in the container, the
device must not be operated.
3. After filling salt wait about three minutes before starting a program so that the salt can dissolve.
Determining the water hardness
1. Determine the local water hardness using a titration test (e.g. from Caldur, art. no. 71000). Allow the
water to run a little before conducting the test. This ensures an exact result.
2. Set the determined water hardness in the Settings > Water hardness in °dH menu.
Regeneration
} Start the "Regeneration" program.
Filling process agents
1. Place a 5litre container of cleaning agent and a 5litre container of neutralizer in the device drawer,
and close them with the corresponding cap (blue = cleaning agent, red = neutralizer) and suction
lance.
2. Transfer the rinse aid from the original packaging into the 1litre container and close the container with
the black cap with suction lance.
NOTICE
Do not use a rinse aid to reprocess ophthalmological instruments!
n Remove the rinse aid container from the process agent drawer and hang the black suction
lance in the suction lance bracket.