QDR InfiniBand Switch Platform User Manual Rev 3.4
Mellanox Technologies
61
Appendix B: Passing the Power Cord From the Connector
Side to the Power Side
This appendix will demonstrate the installation procedure to follow should you need to bring the
power cords from the connector side of the switch to the power side of the switch in a full rack.
Tools and Customer Supplied Parts
Parts included in the installation kit:
Figure 34: Rack Installation Kit Parts
• Phillips Screwdrivers #1 and #2 • Grounding screw
• ESD Strap • Grounding wire sufficient to reach a valid ground.
•ESD mat
•2 rails • 8 recessed flat head screws
• 2 rail slides • 4 caged nuts
• 8 pan head screws M6 • 2 metal washers