EasyManua.ls Logo

Micromeritics GEMINI VII 2390 - Page 100

Micromeritics GEMINI VII 2390
113 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 Installation Checklists
Procedure
Evaluation
Code
Initial / Date
The analyzer has been connected to a power source. P F N/A
Configure the Ethernet port. P F N/A
Connect computer to analyzer. P F N/A
Connect theEthernet switch, if applicable.
n If one Ethernet based analyzer was purchased, connect the
Ethernet cable to the analyzer and the computer, or
n If more than one Ethernet based analyzer was purchased,
connect an Ethernet cable from the computer to the Eth-
ernet switch. Then connect the Ethernet based analyzers to
the Ethernet switch.
P F N/A
Install application software (not for keypad installations). P F N/A
Computer or Keypad Setup
9 - 2
Gemini VII 2390 Installation Instructions and Checklist
239-42870-02 Rev (B) May 2021

Related product manuals