EasyManua.ls Logo

Micromeritics GEMINI VII 2390 - Adsorptive Line Test

Micromeritics GEMINI VII 2390
113 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Keypad Only Installations
ADSORPTIVE LINE TEST
Guidelines for Connecting Gases on page6 - 1
Clean and Verify the Gas Line on page3 - 4
This test helps to clean and verify the gas line for the adsorptive; first from the instrument to the
regulator shut-off valve, then from the instrument to the gas cylinder shut-off valve. This test
should be performed every time the adsorptive gas cylinder is replaced.
Always confirm the state for valves and the low-pressure gauge reading.
A. Gas tubing to instrument
B. Gas regulator shut-off valve -
OPEN
C. Low pressure gauge (15-18
psig)
D. High pressure gauge
E. Gas cylinder shut-off valve -
CLOSED
F. Regulator connecter nut
G. Regulator control knob -
OPEN
H. Brass reducer fitting
A series of prompts displays each time ENTER is pressed. Some prompts may request a task to
be performed. Always perform the task before pressing ENTER.
Informative prompt. Indicates how long a test will take or when an operator should open or close
a valve. Read the message, then press ENTER.
3 - 16
Gemini VII 2390 Installation Instructions and Checklist
239-42870-02 Rev (B) May 2021

Related product manuals