9 INSTALLATION CHECKLISTS
Use these codes to complete the tables in this section, then initial and date each section. If the
table has an Initial / Date column, the person completing the procedure should enter their initials
and the date.
P Pass. Indicates the procedure has been successfully completed without error.
F Fail. Indicates the procedure has been unsuccessful and prevents the analyzer from
being installed for use.
Y Yes. Indicates the procedure has been performed.
N No. Indicates the procedure has not been performed.
N/A Not Applicable. Indicates the procedure does not apply to your system.
Procedure
Evaluation
Code
Initial / Date
Review the Pre-installation Instructions and Checklist
document and ensure that the laboratory is prepared for
installation.
P F N/A
Ensure that the required personnel are available. P F N/A
Ensure that all equipment has been unpacked and verified
using the packing list.
P F N/A
Ensure that all equipment has been checked for shipping
damage.
P F N/A
n If damage occurred during shipment, has it been reported
to the carrier?
Y N N/A
Analyzer is located in a suitable environment. P F N/A
Ensure computer is ready for installation (not for keypad
installations).
P F N/A
Are the gas supply cylinders within 6 ft (2 m) of the analyzer
inlet valves for standard installation?
P F N/A
Line voltage has been verified to be within tolerances and
changed if required.
P F N/A
Prepare for Installation
9 Installation Checklists
Gemini VII 2390 Installation Instructions and Checklist
239-42870-02 Rev (B) ā May 2021
9 - 1