EasyManua.ls Logo

Micromeritics GEMINI VII 2390 - Fill and Install the Dewar

Micromeritics GEMINI VII 2390
113 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FILL AND INSTALL THE DEWAR
Dewar Precautions on the previous page
1. Fill the Dewar with the analysis bath liquid (such as liquid nitrogen) to no higher than 1in.
(2.5cm) from the top for a large Dewar or no higher than 3/4 in. (2 cm) from the top for a
smaller Dewar.
Incorrect fluid levels can lead to measurement errors. Check the level of the bath
liquid before each analysis.
2. Check the level of the analysis bath liquid. For best results, if the Dewar has not been used
for a while, allow approximately 30 minutes for the temperature of the Dewar to stabilize
with the bath liquid, then recheck the level of the bath liquid. Add additional liquid if
necessary.
3. Slide the Dewar cover to approximately 7.5 cm (3 in.) from the sample port nuts to ensure a
proper seal on the top of the Dewar.
4. Place the Dewar on the elevator. A Dewar support is not necessary for the larger Dewar
used with the Gemini 2390t. Place the Dewar directly on the elevator.
5. Close the safety shield on the front of the analyzer.
Fill and Install the Dewar
Gemini VII 2390 Installation Instructions and Checklist
239-42870-02 Rev (B) May 2021
7 - 15

Related product manuals