2 EQUIPMENT INSTALLATION
n The installation location must be in an area that is easily accessible from all sides for servicing
and operating.
n The instrument cannot be installed in a wet area.
n The power cable should be connected only to a suitable wall outlet.
n Gas cylinders should be placed within 6 ft (2 m) of the degasser. The same gas cylinder can be
used for both the prep station and the instrument by using a tee fitting on the gas supply line.
n Only inert gasses (helium, nitrogen, or argon) should be used for sample preparation. Inert
gasses in the quantities used by the degasser do not pose a health hazard to users.
n The equipment must be positioned such that the mains supply is not obstructed and is easily
accessible to disconnect the equipment from the ACmain power supply.