9 Installation Checklists
Procedure
Evaluation
Code
Initial / Date
Install the components of the vacuum pump (including oil, if
applicable).
P F N/A
Check the pump voltage setting. P F N/A
Connect the vacuum pump to analyzer. P F N/A
Power ON the vacuum pump switch (if applicable). P F N/A
Power ON the analyzer. P F N/A
Install the Vacuum Pump
Procedure
Evaluation
Code
Initial / Date
Verify that the gas supply location is standard - meaning that
the gas supply cylinders are located within 6 ft. (2 m) of the
gas port.
P F N/A
Regulators attached to gas cylinders. P F N/A
Nitrogen connected to gas cylinder. P F N/A
Gas lines attached to the instrument. P F N/A
Gas lines tested for leaks. P F N/A
Gas specified in application. P F N/A
Connect Gases
Procedure
Evaluation
Code
Initial / Date
Measure saturation pressure. P F N/A
Measure Saturation Pressure
9 - 6
Gemini VII 2390 Installation Instructions and Checklist
239-42870-02 Rev (B) ā May 2021