EasyManuals Logo

Millipore Synergy R User Manual

Millipore Synergy R
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #21 background imageLoading...
Page #21 background image
Installation
15
Installation of the Tygon® Tubing
ATTENTION
Do not use any white tape on the threads of the Barbed Fitting. An O-ring is
located inside the POU Dispenser to ensure water tightness between the threads
of the POU Dispenser and the Barbed Fitting.
A
Locate the clear Tygon Tubing and the Barbed Fitting from the
Accessories Bag.
Screw the Barbed Fitting onto the bottom end of the POU
Dispenser (A).
B
Push one end of the Tygon Tubing onto the end of the
Barbed Fitting (B).
Place the other end of the Tygon Tubing in a sink.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Millipore Synergy R and is the answer not in the manual?

Millipore Synergy R Specifications

General IconGeneral
BrandMillipore
ModelSynergy R
CategoryWater Filtration Systems
LanguageEnglish

Related product manuals