EasyManua.ls Logo

MIMAKI SWJ-320 S4 - Checking Path Length(for Right and Left) of Feeding Surface

MIMAKI SWJ-320 S4
210 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© 2013 MIMAKI ENGINEERING CO.,LTD. 4.3.8 P.1
R.1.0
1
2
3
4
5
6
7
8
MAINTENANCE MANUAL > Adjustment > Mechanical Adjustment > Checking path length(for right and left) of feed-
Model
SWJ-320S
Issued
2013.03.08
Revised F/W ver
1.0
Remark
1.0
Rev.
4.3.8
Checking path length(for right and left) of feeding surface
Outline
If media skew is thought to be caused by the difference of the path lengths, check them.
Required part
JV5 option: A103240/OPT-J0274 Path Length Measuring Wire Set
Checking procedure (front of machine)
1. Remove the pinch roller at the right edge and attach the wire tip
with the pinch roller shaft.
2. Pass wire as indicated.
Fold back the path and pull wire up over the platen.
Pinch roller
OPT-J0274
When you push the pinch roller from above, it comes
off.
Push
ピンチロ
OPT-J0274
Roll shaft
Tension bar

Table of Contents

Other manuals for MIMAKI SWJ-320 S4

Related product manuals